Preline Checklist for Interior Linings NZ
A proven quality control process before installing GIB and interior linings, helping ensure every project is ready for the next stage.
What is a Preline Checklist?
A preline checklist is a quality control process completed before interior wall and ceiling linings are installed. At this stage, services, framing, insulation, fixing requirements, and wet area preparation all need to be checked before the walls and ceilings are closed up.
A thorough preline process helps reduce rework, improve coordination between trades, and maintain build quality from the start.
Our Preline Quality Control Process
At Buildmac, every project goes through a detailed preline inspection before linings are installed.
This ensures:
All services are installed and tested
Framing and supports are correctly prepared
Insulation meets required standards
GIB fixing requirements are met
The site is ready for the next stage
Materials & Site Readiness
GIB, glue, and screws are on site and stored correctly
Site is clean and ready for installation
Services & Pre-Wire Checks
Electrical pre-wire completed
Plumbing, gas, and aircon installed
Pipes secured and marked
Walkthrough completed with trades